Project to improve energy efficiency and reduce electricity consumption at EGISA (end 2021)

  1. Definition of the main objectives of the project: the main objective of the project is to improve the technology and energy efficiency of EGISA’s refrigeration system, through the replacement of the cooling air conditioning production equipment with a new state-of-the-art air conditioning system, thus achieving savings in electricity consumption, as well as in CO2 and Tep emissions.
  2. Energy improvements achieved: with this project, a total of 587,796.00 kWh/year has been saved, which means a saving of 50.54 Tep and a reduction in Co2 emissions of 306.24 TCo2 per year.